Office, production and storage in a fenced, 2023-renovated complex right on the river.
Choose use and size. You see the price and size instantly and carry the selection straight into your enquiry.
Guide value. Utilities are billed separately; the exact price depends on position in the building, ceiling height and the fit-out you need.
Duga Resa sits in the corridor between the capital and the Adriatic port. Short distances for commuters, logistics and deliveries.
The complex is the former Pamučna industrija Duga Resa, founded in 1884 on the bank of the Mrežnica. From the start, one of Croatia's first hydropower plants drove the spinning machines. The town grew up around this factory.
The site: office wing, production and storage halls around the inner courtyard, the river on the west side.
The complex generates its own power from two renewable sources: hydropower from the adjacent Mrežnica river and photovoltaics on the large rooftops. Together they form a largely closed energy loop, year-round supply and a strong ESG profile for tenants with green reporting. A hydro plant has powered this site since 1884, one of the first in Croatia.
The adjacent Mrežnica delivers renewable power right on site, as it has since 1884.
Photovoltaics on the large rooftops generate additional power on site.
Hydro and solar combined: your own green power and a clear ESG profile for companies with green-reporting duties.
Storage up to 16,000 m² with ground-level loading ramps, ten minutes to the A1 and a link toward the Port of Rijeka.
Daylit halls with an adjoining office in one complex, all on a single site.
Small units with no agent fee that can grow with the business.
On-site solar generation for companies with green-reporting obligations.
| Space type | Size | Price / m² |
|---|---|---|
| Office | 50 to 1,400 m² | €3.00 to €5.00 |
| Production | 200 to 16,000 m² | €2.50 to €5.00 |
| Storage | 200 to 16,000 m² | €2.50 to €5.00 |